This page gives you an idea of the work involved to produce a SWS static vivier system

Click here to contact us by clicking this button Call Now

External

Exterior 

Layout and design phase is expected to take approximately 2 weeks.
Templating, electrical/pipework routing and first fix approximately 2 weeks.
Final fit, testing, implementation and acceptance trial will be the final phase of the project and should take approximately 7-10 days.

 

Click here to contact us by clicking this button Call Now

 

Click here to contact us by clicking this button Call Now

Stainless tanks fixed to raised platform to allow easy access to trunking and feed pipes.

Air is provided from overhead pressure monitored feed pipes.

Access to tanks, switch gear, pumps and alarms via raised walkway.

General Interior

Internal

Matrix

Interior tank layout and blowers

Filtered air intakes and constant flow blowers ensure adequate air flow for all tanks.

Uniform matrix layout ensure even air distributuion and water circulation in the tanks during operation.

Overhead sprayers (Not Shown) ensure good oxygen absorption at the surface and facilitate good gas exchange.

 

Interiors (Tank matrix in place)

Tanks inter-connected to prevent overflow.

Internal 2


Switch gear

Standardised layout

Standardised layout allows easy access to pumps and switch gear for future maintenance.

Click here to contact us by clicking this button Call Now


 

Robust Internal connections and switch gear.

Switch Gear


Internal Monitoring and Alarms


Alarm

System Monitoring and Alarm Systems

All essential system power and environmental factors are automatically monitored and alarmed.

Click here to contact us by clicking this button Call Now

 

Alarm_2

External Alarms

 

RobustTaps and Pipes.

Pipes and taps are deisgned to be easy to clean and be easily accessible.

External Fittings

 

Click here to contact us by clicking this button Call Now

Drains and pipeline feeds in place.
Final stages of completing the wiring,
control systems and blowers installation on
the external cradle.

 

Drains and Overflow.

Overflow

 

 

Click here to contact us by clicking this button Call Now

Drains and pipeline overflow feeds in place. These ensure that the tanks can be safely drained and the water levels easily maintained.

 

Drains and Overflow.

Click here to contact us by clicking this button

Call Now

 

Completed Vivier Unit

Drains and pipeline feeds in place. These ensure that the tanks can be safely drained and the water levels easily maintained.

Note the rodding piont for easy access in case of blockages.

 

Spray System in Place.

Overflow

 

 

Click here to contact us by clicking this button Call Now

Overhead spray system ensures good surface gas exchange and helps maintain water levels.

 

Input and Outflow.

Click here to contact us by clicking this button

Call Now

 

Vivier Outlets

Clip on inlet and outlets helps in quick fill and drainage and the maintance of steady flow states within the tanks.

 